Which of the following should be considered when designing measurement systems, methods and metrics?
1.	The services
2.	The architectures
3.	The configuration items
4.	The processes
   A.	1, 2 and 3 only
   B.	1, 3 and 4 only
   C.	2, 3 and 4 only
   D.	All of the above